Home Page
Featured Projects
Case History 1: Biomass Gasification Project: Greenhouse
Case History 1: Biomass Gasification Project: Greenhouse Looking for alternatives to rising natural gas prices, the grower learned of the uses of available municipal solid waste as a biomass fuel. Because manual recycling is performed the paper wastes are easily obtained. read more...read more...

Case History 2: Process Steam From Site Waste (Bio Mass)
Case History 2: Process Steam From Site Waste (Bio Mass) Highlights: The Developer was looking for a Natural Gas Alternative and wished to utilise available waste wood fuel. The heating design had been completed but the only change required to switch to a biomass solution was in the type of boiler. read more...read more...
ECO LINK POWER LTD
The Old Filling Station
Great North Road
Great Ponton
Grantham
Lincolnshire
NG33 5AQ
Tel: 01476 530302
Mob: 07800 601808
Email: ken@ecolinkpower.com
Copyright © 2009 @ www.ecolinkpower.co.uk. All rights reserved.